Magnetic Mini GPS Tracker with Real-Time Location, Movement Alerts and Audio Monitoring
Loading...
Keep Track of Location at All Times
The small magnetic tracker shows the location of vehicles, luggage, valuables and pets directly on your smartphone, in real time.
Features
- GPS tracking with real-time location updates
- Notification as soon as the item moves
- Audio monitoring via remote access
- Attaches magnetically to metal surfaces, without drilling or mounting
- Controlled via an app for iOS and Android, set up in a few minutes
- Operates from -20 Β°C to +70 Β°C, so also in rain, snow and heat
Areas of Use
- Cars
- Luggage and bags
- Expensive tools and equipment
- Bicycles and motorbikes
- Elderly family members
- Pets
Technical Data
- Housing made of sturdy ABS plastic
- Dimensions: 4.12 cm Γ 1.36 cm
- Frequencies: 850/900/1800/1900 MHz
- Power supply: 3 V lithium coin cell
Actually looks like the photos
Colour and fit matched what I expected from the website. The material feels better than expected and delivery was quick. Really pleased with the order.
Next day, no bother
Ordered in the afternoon and it arrived the following day. Fits brilliantly and the whole process was straightforward.
Still feels current
The styling feels clean and modern rather than dated. Classic pieces without trying too hard to follow trends.
Sizing is spot on
Followed the size guide and my usual size fit perfectly. Nicely balanced fit without feeling too loose or too slim.
Proper quality
The fabric has a substantial feel and the finishing is very neat. It looks and feels like a genuinely well-made piece.
Looks exactly like the photos
The colour and cut were accurate to the website and it arrived nicely packaged. Very happy with it.
Sorted without any fuss
I ordered the wrong size and contacted support. They replied quickly and sorted everything without unnecessary back and forth.
A real person behind it
The attention to detail comes through in the packaging, service and consistency. Ordering feels much more personal.
Held up after washing
Several washes later and it has kept its shape and colour. Still looks much like it did when it arrived.
Worth every penny
Compared a few alternatives before ordering. The quality feels very fair for the price and the product feels built to last.
My husband ordered one too
I ordered first and after seeing mine my husband went straight to the site for his own order. Great choice for both of us.
Returns were simple
One item wasn't quite right so I contacted the team. They responded quickly and handled the return without hassle.
No issues at all
Delivery was quick and straightforward. The quality is excellent and the sizing was accurate.
Third order this month
Third order already. That probably says enough.